Province index
Province rules change the value path for the same equipment.
Direct answer
Enerwav publishes a province guide only when current official evidence supports a distinct utility, tariff, settlement, connection, or resource decision. Five provinces now meet that private review threshold. Unverified provinces remain unbuilt rather than cloned.
· Province guide
Code-native diagram
Province evidence filter
A province page is published only after distinct rules, tariffs, projects, and decision paths are verified.
| Step | Evidence question |
|---|---|
| 1 | Official rules |
| 2 | Controlling tariff |
| 3 | Project evidence |
| 4 | Distinct decision |
Conceptual geometry only. The official source basis and verification date are listed in the evidence rail on this page.
A province name is not a tariff
Electricity value depends on the utility, rate class, billing determinants, export treatment, market settlement, and interconnection rules. Province guidance can narrow the questions, but the customer's bill still controls the calculation.
Alberta starts with micro-generation class and retailer structure
The Alberta guide separates small and large micro-generation, retail or wholesale credit treatment, distribution-company connection, and delivery charges. It does not use a default small-business energy rate as a large commercial input.
Ontario separates net-metering credits from Global Adjustment
The Ontario guide distinguishes the live regulatory capacity criterion, utility interconnection, Class A or Class B settlement, and one named utility demand-tariff example. OEB credit scope and carry-forward details remain suppressed while the official pages are unreachable.
British Columbia separates import service from self-generation
The British Columbia guide distinguishes BC Hydro General Service classes, demand and energy units, the 2026 self-generation schedule transition, utility authorization, Vancouver resource context, and province-filtered project records.
Saskatchewan starts with service and interconnection study
The Saskatchewan guide distinguishes supplied transformation, kVA demand, monthly energy blocks, study and quotation gates, a dated bill credit, Regina resource evidence, and the present absence of a reviewed provincial project record.
Quebec separates Rate G, Rate M, and surplus banking
The Quebec guide distinguishes the two business-rate structures, Net Metering Option I, ownership and authorization, Montreal resource context, the project-record gap, and the bilingual review boundary required before targeted publication.
Future province pages require differentiated evidence
A new province page needs current official rules, a source register, real project records, and a distinct user decision. Keyword substitution is not enough.
Province guidance narrows the evidence search
A province guide can identify the governing market structure, official program entry points, common connection route, and province-specific settlement question. It cannot identify the customer's utility class, contract, meter configuration, load profile, approved project size, or current account treatment without site evidence.
The province hub therefore routes readers to differentiated evidence instead of presenting a national table of assumed prices. Alberta, British Columbia, Ontario, Saskatchewan, and Quebec have distinct guides because the reviewed official sources support different micro-generation, self-generation, net-metering, tariff, and settlement decisions. Other provinces remain unbuilt until an equally specific decision path is verified.
Keep unreachable OEB details out of the hub
Ontario Regulation 541/05 supports the renewable-generation criteria and the 500 kW cumulative output limit for electricity returned under net metering. The OEB pages that describe credit scope and carry-forward were unreachable from the review environment, so the hub does not repeat those details.
The Ontario guide keeps the affected OEB credit-scope and carry-forward claims suppressed and separates them from the live regulation, utility tariff, interconnection, and IESO settlement sources. This prevents a reachable source from being used as a substitute for a different unavailable claim.
Bring the account evidence to the province guide
Before using a province guide, identify the legal account holder, service address, distributor, retailer where applicable, rate class, meter identifiers, billing period, energy units, demand units, fixed and variable charges, export arrangement, taxes, riders, interval-data source, and utility contact or portal used for current information.
The owner should also record planned project type, preliminary size, expected operating mode, available-for-use target, interconnection status, and whether storage is intended for demand, Global Adjustment, energy shifting, or resilience. These facts determine which sections of the province guide apply.
Publish another province only when the decision differs
A new province page needs current official rules, a differentiated market or utility decision, source-backed project evidence, a clear suppression boundary, and a route that does not repeat another guide with place names substituted. Search volume alone is not enough.
The page should also survive a source check and human review. If a rule cannot be verified, the dependent value remains absent. If the available evidence supports only a general national explanation, that explanation belongs in an economics or technology guide rather than a thin province page.
Carry province findings into the requirements brief
The selected guide should produce a short handoff: controlling utility or market party, account class, import and export treatment, interval-data source, application path, project records reviewed, under-review claims, and the next evidence owner. That handoff keeps province context attached when the project moves into engineering, budgeting, tax, or contract review.